- Building commissioning is a quality-focused process necessary for both non-complex and complex modern construction projects.
- The School District contracted with Hill International Inc . in Spokane to perform both construction management services and building commissioning services.
- According to NIST, the time needed to do building commissioning right is rarely available, defects and opportunities are overlooked, and system potential goes unrealized.
- These areas have included project and program management, construction management at-risk ( CM / GC ), design-build, and building commissioning.
- There is no such an article in the English wikipedia, although there are articles for Ship Commissioning and Building Commissioning which are special subcases of Commissioning.
- It's difficult to find building commissioning in a sentence. 用building commissioning造句挺難的
- While the practice of building commissioning process is still fairly new in the construction industry, it has quickly become common practice as building owners and developers try to get more out of their investment.
- Mid-size commercial buildings don't need to meet LEED certification requirements but must meet LEED standards for building commissioning, landscaping, water use, and construction debris management starting in 2009, and must meet enhanced commissioning standards and tighter water use requirements starting in 2010.
- "' Building commissioning ( Cx ) "'is the process of verifying, in new construction, all ( or some, depending on scope ) of the subsystems for mechanical ( HVAC ), plumbing, electrical, fire / life safety, building envelopes, interior systems ( example laboratory units ), co-generation, utility plants, sustainable systems, lighting, wastewater, controls, and building security to achieve the owner's project requirements as intended by the building owner and as designed by the building architects and engineers.
- While the service method can vary from owner to owner and project to project, the basic formula for a successful building commissioning process involves a synergy team from pre-design to develop the owner's project requirements ( OPR ), commissioning scope and plan, including benchmarks for success, review of design documents and checklists for achieving the Owner's Project Requirements ( OPR ), development of checklists and verifying a sample of construction checklists and submittals, developing training needs and evaluating training delivered by the contractors, witnessing and verifying construction phase tests, and periodic site observations during the construction phase, and performing commissioning functional testing as the project nears completion.